Permits & Inspections
Electrical Permit
Permit Fee Calculator for Contractor
Simply input the required information and the permit fee calculator will provide you with the permit fee.

Frequently Asked Questions
- Electrical
- Gas
No, in addition to a bond a Contractor’s licence is required. Having just a bond will not allow you to pull permits or work as a Contractor.
- Electrical
- Gas
- Plumbing
Legally you can request a copy of any permit for work performed on your property. This applies to all plumbing, gas, or electrical work. If a contractor is unwilling to supply a copy of a permit, please call TSASK toll free at 1-866-530-8599.
- Electrical
The term “immediate family” is defined as father, mother, father-in-law, mother-in-law, spouse, common-law spouse, brother, sister, brother-in-law, sister-in-law, son, daughter, son-in-law, daughter-in-law, grandparent, or grandparent-in-law.
They must hold a Saskatchewan Electrical Journeyperson licence to perform work under your homeowner permit. You will need to provide their Saskatchewan Electrical Journeyperson licence number. Red Seal or other provincial licences are not accepted on their own.
- Electrical
It is an inspection of any wiring installation prior to finishing of the walls. (i.e. drywall, wall board, etc.)
- Electrical
A structure used as a residential dwelling exclusively for occupancy by one family. Dwellings such as a condominium, duplex, or townhouse that share walls with another dwelling are not considered a single-family dwelling.
- Electrical
All the branch circuit wiring throughout the home and garage (attached or detached), as well as a subpanel if required.
Branch circuits start at the breaker box and extend to the electrical devices connected to the service. Branch circuits are the last part of the circuit supplying electrical devices.
- Electrical
No. Due to the complexity of the work and working with unprotected electrical equipment, a licensed Saskatchewan Electrical Contractor is required to perform the work under the authority of a contractor’s permit.
- Electrical
You can obtain the permit ONLY if you are a licensed Saskatchewan Electrical Journeyperson or if your immediate family member is a licensed Saskatchewan Electrical Journeyperson and is performing the work.
- Electrical
You will be provided with a Homeowner Energization Sticker at the time you receive your homeowner permit. Applying this sticker confirms you have installed the service to the latest codes and standards and that it is ready to be energized by the power company. Arrangements for the disconnect and reconnect are your responsibility through the power company.
- Electrical
No. This is not a part of the single-family detached dwelling and therefore all electrical work must be performed by a licensed Saskatchewan Electrical Contractor under the authority of a contractor’s permit.
- Electrical
No. Licensed Saskatchewan Electrical Contractors are responsible for purchasing and submitting permits for the work they are doing. It is your right to ask the contractor for a copy of the permit.
- Electrical
Yes. Choose the Miscellaneous Wiring section on the permit application.
- Electrical
Yes. A permit is required to ensure that the interconnected wiring and the devices are compatible and installed correctly. If during renovation or repair work, the walls are opened or if cabinetry is removed/replaced, every effort shall be made to ensure that the electrical wiring and circuitry for all outlets are brought up to the current Canadian Electrical Code (CEC). Contact the Electrical Inspector on what is required for the current CEC.
- Electrical
Yes. Permits are required for all electrical work in your home.
- Electrical
Yes, as long as the work being performed on each floor is not more than 50% of the residence. If more than 50%, choose the Wiring or Rewiring of a Single-Family Dwelling section on the permit application.
- Electrical
Yes. Permits are required for all electrical work in your home.
- Electrical
A permit is required for electrical installation as per the Electrical Inspection Act 1993. Failure to do so may result in the disconnect of the service.
Purchasing a permit entitles you to an inspection. The Electrical Inspector will ensure the work is up to code and is done in a safe manner.
- Electrical
It is the permit holder’s responsibility to contact the Electrical Inspector to arrange the inspection prior to the installation of any wall coverings (drywall, paneling, shiplap, etc.) which would render the wiring inaccessible. The inspector will discuss any further inspections.
Contact the Electrical Inspector using the phone number or email address listed on the permit to arrange for an inspection.
- Electrical
Contact our office. Homeowner permits may be cancelled and refunded up to one year prior to the commencement of work. No refunds will be issued after work commences.
- Electrical
Homeowner permits are valid for 12 months from date of purchase.
- Electrical
Please email us at geis@tsask.ca or call 1-866-530-8599 and we will be happy to help you.
- Electrical
You must have a registered GEIS account to submit plans. If you are an electrical contractor with a GEIS account, you can access the portal under the “New” menu.
If you are not registered, you will need to create an account by following these steps:
- Go to GEIS to create a username and password.
- Once your registration is submitted, you will receive an email with a link to verify your email address.
- Your registration will be pending TSASK approval. You will receive an email that your account has been activated. Please allow up to 2 business days.
- Electrical
There are two types of user accounts, Company Administrators and Normal Users.
- Company Administrators can add or remove users, reset a user’s password, enter and submit plans, and pay for plans. It is recommended that you have at least two Company Administrators for the account.
- Normal users can enter and submit plans and pay for plans.
- Electrical
No. Each address must be submitted separately.
- Electrical
Yes. You will see progress in real time with one of the following statuses:
- Submitted: Your plan is submitted and is in the queue to be assigned to a reviewer. It could be in this status anywhere from 4-8 weeks.
- In Review: Your plan has been assigned to a reviewer and the review process has started.
- Returned: Your plan has been returned due to required information not included with your submission. When the required documents have been uploaded, your submission will be placed back into the queue.
- Authorized: The review is complete and is ready for payment, if applicable.
- Electrical
You can upload the following extensions: PDF, PNG, ZIP, JPG, JPEG, EML and MSG.
- Electrical
The file size limit for an electrical plan submission is 50MB.
- Electrical
Once the review is complete, you will receive an email with a payment link.
- Electrical
Once the review is complete, you will receive an email with a payment link. Upon receipt of payment, the Outcome Letter will be available for download. If payment is not required, you will receive access to the Outcome Letter as soon as the review is complete. Payment options are by credit card online, EFT, or by cheque.
- Electrical
The waiting time for review remains at 6-8 weeks for non-expedite and 4-6 weeks for expedite.
- Electrical
If you did not include all the required documents with your submission, your application will be “returned” and removed from the queue. You will need to submit the missing documents as identified in the email within 5 business days. Once you have uploaded the required documents to your portal, your application will be placed back in the queue the day it was resubmitted. If the the missing documents are not uploaded within 5 business days, the plan will be cancelled.
- Electrical
We will no longer accept plan submission through the mail or by email. You must have a GEIS account in order to submit plans.
- Electrical
No, all electrical contractors who have a GEIS account will have access to submit electrical plans.
- Electrical
Electrical Contractors who have an existing online GEIS permit account will already have access to submit electrical plans. New applicants (excluding contractors) will have to register for an applicant’s account which is similar to registering for an online permit account. The applicant can be the homeowner submitting the plan, the company installing the solar project, or the engineer company doing the plans on behalf of the contractor/solar company/homeowner.